Background Image

Gulfstream G650ER




Offered Exclusively for Sale by Boutsen Aviation

2020 Gulfstream G650ER

MSN 6411 - VP-CZM

Ask for More Information
Background Image
Highlights / 2022-08-08


“This unique & immaculate one-owner 2020 Gulfstream G650 with extended range is in “as new” condition with only 285 TSN. Fully enrolled on programs, MSN 6411 boasts an array of options including EVS II, Head Up Display and KA Band. Available for viewing in Basel Switzerland, this G650ER is one of the rare recent units for sale on the market!”

- Dominique Trinquet, President
  • Specifications
    Specifications

    • Low Time – Mint Condition
    • Engines on Rolls-Royce CorporateCare
    • APU on MSP
    • 14 Pax Configuration – Fwd Galley
    • Jet ConneX Ka Broadband High-Speed Internet
    • Private Use Only
    • No Damage History - On CMP
    • New Aircraft Warranties Fully Transferable
    • One Highly Qualified Owner Since New (Top 30 Forbes 2021)

  • Engine(s)
    Engine(s)

    • Rolls-Royce BR725A1-12
    • On Rolls-Royce CorporateCare
    • Engine 1: 285 TSN
    • Engine 1: 129 CSN
    • Engine 2: 285 TSN
    • Engine 2: 129 CSN

  • APU
    APU

    • Honeywell RE220
    • MSP
    • 560 TSN

  • Avionics
    Avionics

    Gulfstream PlaneViewTM II / Honeywell Primus Epic Avionics Suite
    • 3 Modular Avionics Units
    • 4 Large 14-inch adaptive LCD Displays
    • 1 Rockwell Collins Head Up Display (HUD II)
    • 1 Enhanced Vision System (EVS II)
    • 1 Synthetic Vision - Primary Flight Display (SV-PFD)
    • 2 Standby Multifunctional Controllers
    • 3 NextGen Flight Management Systems (FMS)
    • 3 Inertial Reference System (IRS) LASEREF VI
    • 4 Multifunction Air Data Probes
    • 1 Automatic Emergency Descent Mode (EDM)
    • 1 RDR-4000 3-D Weather Radar
    • 1 MCS-7120 (Phase 4) SATCOM
    • 1 FANS-1A+ (CPDLC/ADS-C)
    • 1 Datalink VDL Mode 2
    • 2 GPS with Wide Area Augmentation System (WAAS)
    • 1 Automatic Dependent Surveillance Broadcast
    • ADS-B Out (DO-260B)
    • 1 Lateral Precision Vertical (LPV) Approach Capability
    • 2 (MODE S) Transponders
    • 1 Traffic Collision Avoidance System (TCAS II)

  • Equipment
    Equipment

    • Inmarsat Jet ConneX Ka Broadband High-Speed Internet System
    • Classic Aero Service Connectivity (AERO H+)
    • ASC 002A - ARINC Direct Datalink Service Provider
    • ASC 005B - Runway Awareness Advisory System – RAAS
    • ASC 006B - Lightning Sensor System – LSZ-860
    • ASC 007A - Predictive Windshear
    • ASC 039 - Protected Mode – Controller Pilot Data Link Communication
    • ASC 076B - Aircraft Health and Trend Monitoring System
    • ASC 096A Part 2 - 8.8 kHz Underwater Acoustic Beacon – UAB
    • ASC 122A - Engine Fire Protection (ATA 26)
    • ASC 133A - Engine Electronic Controller
    • ST04254AT-D - BBML Highspeed Data System (KA-Band)
    • ST04252AT-D - Airplane Interior
    • ST04277AT-D - Lightning Sensor
    • ST04309AT-D - Iridium Satcom System (FANS 1/A+ over Iridium)
    • ST04319AT-D - Satcom Gateway System

  • Interior
    Interior

    • 14 Pax Configuration, No Crew Rest
    • Forward Cabin: Four-single club seats
    • Mid Cabin: Fwd Four-single club seats
    • Mid Cabin: Aft Four-place conference group opposite a one console table and one single seat
    • Aft Cabin: One double bed opposite a one console table and one single seat
    • Forward galley includes convection oven, microwave, and two coffee makers
    • Forward and aft vacuum lavatories
    • 2 Blu-Ray DVD Players
    • 1 26'' HD LCD monitor in the forward right-hand cabin bulkhead
    • 1 26'' HD LCD monitor in the right-hand aft cabin bulkhead
    • 1 12.1'' HD LCD personal monitor in the inboard armrest of each single seat in the passenger cabin (14 seats)
    • 115V/60Hz AC Outlets

  • Exterior
    Exterior

    • Original Paint
    • Matterhorn White with Blue Stripes along Fuselage Mid-Line and Tail

  • Remarks
    Remarks

    • CMP Maintenance Tracking Program
    • Airworthiness Date: Oct 7, 2019
    • In-service Date: February 18, 2020
    • Maintenance:
    • Last 24 MOS completed in February 2022
    • Next 48 MOS due February 2024
    • Next 60 MOS due February 2025
    • Next 72 MOS due February 2026
    • Next 96 MOS due February 2028
    • Next 120 MOS due February 2030
    • Next 144 MOS due February 2032
    • Airframe Warranty:
    • Production component labor & material Feb-2025
    • Production structure labor & material Feb-2040
    • Rolls-Royce engines/TR labor and material Feb-2026 / 3,500 Hrs
    • Rolls-Royce nacelle Feb-2040
    • New Aircraft Warranties Fully Transferable